Dear Mr Meacher,
       
       
      Thank you for your email dated
        16/2.
        Robbie Yapp has been off sick, hopefully he is due back
        tomorrow. I need
        his guidance as a technical surveyor to confirm your issues over
        the these
        units. Could you please grant me a few days to verify and reply
        to you.
       
       
      Regards
       
       
       
       
       
       
      
       
       
       
      Hello, 
        I must say I'm a little disappointed not to have received a
        reply for this
        mail from the 5th Feb - forwarded below. 
        I saw from my mailserver that it had been received by your email
        system
        at the time of sending. 
        In case the pdf/jpg attachments caused reception issues, I have
        packaged
        them up and they are available here: 
       
        https://www.dropbox.com/s/704bgqwc1z542of/20140215-ES1910AR-Meacher-EverestWindows.zip 
         
        This contains: 
        * The proposed design for the small windows I was sent 3rd
          October 2013
        and as such what I'd expected. 
        * A comparison of the original design, what I was expecting and
        what was
        actually (wrongly) produced. 
        * The four scale drawings of what they should be, as pdf files. 
        * Image from across the road showing original and replacement
        windows with
          the same design. 
         
        I've today spotted that the house at #81 across the road has a
        mixture
        of old & new (replacement casement) windows, both of which
        have the
        same design as mine, even though the panels are different sizes
        and shapes.
        This I have included a picture of in the zip file referred to
        above. 
        Therefore, the fact that Everest (being the second largest home
        improvements
        company in the country) have been unable to achieve this, does
        seem quite
        bizarre. 
         
        I really hadn't expected this project to take so long and would
        like to
        point out it has delayed my other refurbishment plans by
          getting on
          for six months. 
        Therefore I am willing to give you the opportunity to resolve
        this farce
        to my satisfaction, although this can only be until I have found
        an alternative
        supplier, at which point we would have to consider this order
        cancelled. 
         
        Regards, 
        Sean Meacher 
         
        On 05/02/14 20:20, sean@xxxxxxxxxxx
        wrote:
       
      Hello Mr Lees,
       
      I see what has happened here. 
        I’ve put together an image titled “one of these is not like the
        others”, which will show you what the differences are. 
        Basically, the ‘scaled drawing’ that may have been supplied to
        CET,
        doesn’t look like the design I sent you previously and gave
        Robbie a copy
        of (as an acetate printout) in December. 
        Somewhere along the line, it has been cropped, not scaled. 
        I’m sure the difference will be immediately apparent to you.
       
       
      I’ve also attached here scale
        drawings
        of what I expected them to look like - where the design is the
        same, accounting
        for the difference in panel sizes. 
        It’s not a difficult change - these took me about half an hour. 
        These are for the 4 panel sizes that I was originally given
        around 3rd
        October. 
        I’ve confirmed with CET that the edge sizes are fine. So for
        that I’m
        happy. 
        Unless you need different panel sizes, feel free to have them
        processed
        appropriately. 
        However I would like confirmation of what is being produced to
        save wasting
        more time, effort and materials. 
        Then when they’re finished, pictures as you kindly provided
        previously,
        so I’m not surprised if/when they eventually turn up at my
        house.
       
       
        When I received the mail last Friday, I will admit I took a
        couple of days
        to calm down from the feeling of shouting at a mindless
        unstoppable behemoth. 
        I’m happy to deal with you directly as you have shown me that
        you can
        be helpful. 
        I would however still like answers to my other queries from the
        2nd Feb. 
         
        Regards,
       
      Sean Meacher 
      
       
      Sent from Windows Mail
       
       
      From: Ken.Lees@xxxxxxxxxxxxx 
          Sent: Monday, 3 February 2014 12:32 
          To: Sean
            Meacher 
          Cc: Robbie.Yapp@xxxxxxxxxxxxx,
      Robyn.Drury@xxxxxxxxxxxxx,
      Helen.Mundy@xxxxxxxxxxxxx
       
       
       
        Dear Mr Meacher,  
         
       
        I sent you an email on the 21 Jan asking you if you had looked
        at our website
        and also if my reply to your email was OK.
         
       
        On the 23 Jan I sent you actual pictures of the units in your
        windows.
        You replied on the 29 Jan some 6 days later after we emailed
        you.  Your
        email was not clear. These are the scaled drawings that were
        supplied to
        CET. I need to know what you are not happy with. I would
        appreciate a constructive
        reply. I would like myself and the surveyor to visit you to find
        out why
        you are not happy with these designs.  
       
        The offer of visiting me to see your actual windows still
        remain. Your
        windows are being delivered Wednesday.
         
         
          Given that the smaller window design appears to have been
          somewhat truncated
          the answer will have to be 'no'. 
          At some future time I would imagine that will be corrected,
          however that
          time is not now.  
       
        We can work together and get these designs sorted as quickly as
        possible,
        or we can play ping pong on emails to prolong this simply task.
        I like
        you want to move forward.  
       
        Kind regards  
       
         
         
      
      
       
       
         
         
        I can't help feeling that we've been here several times before
        and are
        in fact going around in circles. 
        Analogous to me describing to you a racehorse and getting back
        from you
        an elephant. 
        So I do have to say that I've completely lost faith in your
        process. 
        If unit 'B' doesn't look like supplied design 'A', shouldn't
        someone be
        checking that and confirming with the customer BEFORE
        manufacture?? 
        In fact the only part of this project that has gone right so far
        has been
        when I corresponded with CET directly (which both of us were
        happy about). 
        What exactly do you hope to achieve by sending Robbie out
        again?.. given
        that we're still essentially in the same position that we have
        been since
        early October - 4 Months! 
         
        From the original designs I was sent back (dated 3rd October
        2013), there
        were 4 sizes of panel: 
        379x234mm 
        393x234mm 
        405x234mm 
        419x234mm 
         
        This means, for them to not be 'lost in translation' again, I
        have produced
        scale drawings of this remarkably simple glass design and send
        them to
        the appropriate people. 
        If/When those have, as before, been deemed suitable for
        production and
        confirmed, as was the large design (which having finally now
        seen a picture
        of, I'm very happy with!), then hopefully we will be able to
        proceed -
        then I'll send you copies also. 
         
        In my day job, I'm used to dealing with international projects
        that can
        affect upwards from 2000 people. 
        Dealing with home improvements on this scale shouldn't be this
        tortuous! 
        Should we continue with this, I would also expect some kind of
        reduction
        in the cost, given that I appear to be doing your jobs for you.
         
        Please don't get this wrong again or I shall have to find
        somewhere more
        competent. 
         
        Regards, 
        Sean Meacher 
         
         
         
        On 30/01/14 10:06, Robyn.Drury@xxxxxxxxxxxxx
        wrote:  
         
        Hi Mr Meacher,  
         
        Ken Lee's has asked me to make an appointment for Robbie Yapp to
        come see
        you to discuss the window query.  
         
        I can  offer you an early morning appointment again from Tuesday
        4th
        Feb onwards?  
         
        Could you let me know a day that would be suitable to you?
       
         
        Kind regards,  
         
         
      
       
       
       
     
     
  
 |